Final installation steps depend on the exact model, quotation package and destination. This checklist helps surface requirements before order.
Site-readiness checklist
- Room dimensions and clearances around all equipment
- Doorway, corridor, turn, stair and elevator measurements
- Floor condition and loading review where relevant
- Voltage, frequency, outlet, circuit and grounding confirmation
- Ventilation, ambient temperature and moisture conditions
- Unloading, storage and indoor movement plan
- Named operator or household support person
Support documents to request
- Model-specific installation and operating manual
- Complete packing list and serial-number record
- Cleaning and filter schedule
- Consumables and spare-parts list
- Written warranty scope and service path
Remote or on-site installation availability has not yet been confirmed and is not promised here.